Expertise
Multiple assignments included consulting, engineering, and claim support.
PDA developed and managed construction in the full replacement of vehicular traffic membrane over an expansive free span below grade garage. Consulting/claim support assignment established and documented base line existing conditions in light of adjacent construction and environmental events.